 A7 Adhesive Anchoring System

INSTALLATION INSTRUCTIONS
epcon_a7prod2e.jpg (4182 bytes) 1. Drill 1/16" oversize diameter holes for 1/4"–1/2" diameter threaded rods and #3 rebar. Drill 1/8" oversize diameter holes for 5/8"–1-1/4" diameter threaded rods, #4 rebar, grout filled blocks and brick pinning. Clean out hole from bottom with forced air. Complete hole preparation with brush and repeat cleaning with forced air (leave no dust or slurry).
epcon_a7prod2f.jpg (3349 bytes) 2. When starting new cartridge or new nozzle, dispense and discard enough adhesive until uniform grey color is achieved. Insert the nozzle into the bottom of the hole and fill to 1/2 the hole depth.
epcon_a7prod2g.jpg (3168 bytes) 3. Insert rod slowly by hand into the bottom of the hole with a slow twisting motion. This insures adhesive fills voids and crevices and uniformly coats the anchor rod.
epcon_a7prod2h.jpg (3737 bytes) 4.  See table for working times and curring times. After the suggested cure time is met, install and tighten fixture into place.

WARNING: Instruction Insert enclosed in carton to be distributed with each cartridge

WARNING: Manufacturer instructions must be followed